Pumping and ventilation

In many industrial applications, the challenge is not limited to driving a motor, but rather to more precisely regulate flow, pressure, or ventilation according to the actual process demand. This is where a specialized drive offers added value compared to generic solutions.

G120X IP20 380...480V 450kW FSJ C3
€23.159,84 EUR
€46.319,68 EUR
6SL3220-3YE62-1CB0
Plazo de entrega (días): 20D
€23.159,84 EUR /each
Total:
G120X IP20 380...480V 450kW FSJ C3
€23.172,26 EUR
€46.344,52 EUR
6SL3220-3YE62-0CP0
Plazo de entrega (días): 20D
€23.172,26 EUR /each
Total:
G120X IP20 380...480V 450kW FSJ C3
€23.172,26 EUR
€46.344,52 EUR
6SL3220-3YE62-0CF0
Plazo de entrega (días): 20D
€23.172,26 EUR /each
Total:
G120X IP20 380...480V 450kW FSJ C3
€23.089,40 EUR
€46.178,81 EUR
6SL3220-3YE62-0CB0
Plazo de entrega (días): 20D
€23.089,40 EUR /each
Total:
G120X IP20 380...480V 400kW FSH C3
€20.370,93 EUR
€40.741,86 EUR
6SL3220-3YE60-1CP0
Plazo de entrega (días): 20D
€20.370,93 EUR /each
Total:
G120X IP20 380...480V 400kW FSH C3
€20.370,93 EUR
€40.741,86 EUR
6SL3220-3YE60-1CF0
Plazo de entrega (días): 20D
€20.370,93 EUR /each
Total:
G120X IP20 380...480V 400kW FSH C3
€20.288,07 EUR
€40.576,15 EUR
6SL3220-3YE60-1CB0
Plazo de entrega (días): 20D
€20.288,07 EUR /each
Total:
G120X IP20 380...480V 400kW FSH C3
€20.300,49 EUR
€40.600,99 EUR
6SL3220-3YE60-0CP0
Plazo de entrega (días): 20D
€20.300,49 EUR /each
Total:
G120X IP20 380...480V 400kW FSH C3
€20.300,49 EUR
€40.600,99 EUR
6SL3220-3YE60-0CF0
Plazo de entrega (días): 20D
€20.300,49 EUR /each
Total:
G120X IP20 380...480V 400kW FSH C3
€20.217,64 EUR
€40.435,28 EUR
6SL3220-3YE60-0CB0
Plazo de entrega (días): 20D
€20.217,64 EUR /each
Total:
G120X IP20 380...480V 355kW FSH C3
€17.600,03 EUR
€35.200,06 EUR
6SL3220-3YE58-1CP0
Plazo de entrega (días): 20D
€17.600,03 EUR /each
Total:
G120X IP20 380...480V 355kW FSH C3
€17.600,03 EUR
€35.200,06 EUR
6SL3220-3YE58-1CF0
Plazo de entrega (días): 20D
€17.600,03 EUR /each
Total:
G120X IP20 380...480V 355kW FSH C3
€17.517,18 EUR
€35.034,36 EUR
6SL3220-3YE58-1CB0
Plazo de entrega (días): 20D
€17.517,18 EUR /each
Total:
G120X IP20 380...480V 355kW FSH C3
€17.529,61 EUR
€35.059,22 EUR
6SL3220-3YE58-0CP0
Plazo de entrega (días): 20D
€17.529,61 EUR /each
Total:
G120X IP20 380...480V 355kW FSH C3
€17.529,61 EUR
€35.059,22 EUR
6SL3220-3YE58-0CF0
Plazo de entrega (días): 20D
€17.529,61 EUR /each
Total:
G120X IP20 380...480V 355kW FSH C3
€17.446,75 EUR
€34.893,51 EUR
6SL3220-3YE58-0CB0
Plazo de entrega (días): 20D
€17.446,75 EUR /each
Total:
G120X IP20 380...480V 315kW FSH C3
€15.524,28 EUR
€31.048,56 EUR
6SL3220-3YE56-1CP0
Plazo de entrega (días): 20D
€15.524,28 EUR /each
Total:
G120X IP20 380...480V 315kW FSH C3
€15.524,28 EUR
€31.048,56 EUR
6SL3220-3YE56-1CF0
Plazo de entrega (días): 20D
€15.524,28 EUR /each
Total:
G120X IP20 380...480V 315kW FSH C3
€15.441,41 EUR
€30.882,83 EUR
6SL3220-3YE56-1CB0
Plazo de entrega (días): 20D
€15.441,41 EUR /each
Total:
G120X IP20 380...480V 315kW FSH C3
€15.453,86 EUR
€30.907,73 EUR
6SL3220-3YE56-0CP0
Plazo de entrega (días): 20D
€15.453,86 EUR /each
Total:
G120X IP20 380...480V 315kW FSH C3
€15.453,86 EUR
€30.907,73 EUR
6SL3220-3YE56-0CF0
Plazo de entrega (días): 20D
€15.453,86 EUR /each
Total:
G120X IP20 380...480V 315kW FSH C3
€15.371,00 EUR
€30.742,01 EUR
6SL3220-3YE56-0CB0
Plazo de entrega (días): 20D
€15.371,00 EUR /each
Total:
G120X IP20 380...480V 250kW FSG C3
€12.364,34 EUR
€24.728,68 EUR
6SL3220-3YE54-0CP0
Plazo de entrega (días): 20D
€12.364,34 EUR /each
Total:
G120X IP20 380...480V 250kW FSG C3
€12.367,71 EUR
€24.735,42 EUR
6SL3220-3YE54-0CF0
Plazo de entrega (días): 20D
€12.367,71 EUR /each
Total:
G120X IP20 380...480V 250kW FSG C3
€12.282,31 EUR
€24.564,62 EUR
6SL3220-3YE54-0CB0
Plazo de entrega (días): 20D
€12.282,31 EUR /each
Total:
Showing pages 1 of 14